In production since 2017
ELES Slovenia
Using SUMO for real-time operation and operation planning. Mitigation of N and N-1 overloading operational situations and calculations of transmission capacities up to 56 hours ahead. Offering a higher transmission capacity 96% of time, with median increase of 20 % of the nominal capacity. Maintaining safety clearances within permissible limits, also when the operational limit falls below the static limit. Improving the resilience of the system by using a reverse DLR module for icing prevention. Integrated with SCADA/EMS.
Read the case study